OUR WORKS

AIR FLOW

Non-invasive removal of plaque smoking and treatment of soft tissue

Temporary Endo krune

Made temporary inner crown as interim esthetic solution to creating lasting ceramic crowns

PARTIAL RECONSTRUCTION

Partial reconstruction of the upper dental arch of molars right up to the second incisor on the left side of the patient

Reconstruction of abrasive upper front composite

As a result of tooth wear ( abrasion ) , there was a shortening and straightening of the upper incisors , which are reconstructed with composite material .

Lower denture on LOCATORS

Reconstruction of the central incisors with composite

After removing the old restorations made jerekonstrukcija central incisors , the filling on the second incisor to the left , and a little space between the central incisors that the patient did not like .

TWO GOLD CROWNS

Made of two gold crowns on teeth 2 , 3 and 4 on the right side and made partial denture over double gold crowns

 

Reconstruction of the upper and lower dental arch

Endodontics

On the pictures you can see definitely filling the frontal teeth that has been done for prosthetic reasons . Preparation of the root canal is done by machine tools . All six vital extirpation and root canal filling was done in one patient visit , within 1.5 hours , after which he continued with prosthetic therapy.

Reconstruction of the upper and lower dental arch due to abrasion

Reconstruction of the upper and lower dental arch due to abrasion

 

Endodontic Treatment + FRC stakes + reconstruction series

After completing endodontic treatment and setting cast annexes and FRC posts could have been reconstructed upper dental arch .

RECONSTRUCTION OF THE UPPER DENTAL ARCH

Reconstruction of the upper arch in young patients.

Implants 2

RECONSTRUCTION OF UPPER DENTAL ARCH ON A SMALL NUMBER OF CARRIERS

Reconstruction of the upper dental arch on a small number of carriers , but with good layout

Making ceramic crowns

Making ceramic crowns of the second premolars up right up to the second premolar upper left because of the large discoloration and abrasion ( wear ) of the tooth .

Making ceramic bridge from the second molar to the lower right first premolar and lower right of the individual crown to the first premolar down the left to loss of teeth , discoloration and tooth abrasion .

Reconstruction in marked abrasion

Reconstruction in marked abrasion

Making dentures double gold crowns

Reconstruction on combine works

Combined work

Combined work

Fiberglass splints

When patients are placed fiberglass splints to stabilize teeth with each other. Set protective membrane to be comfortable patient and maintaining dry working field . In patients previously performed periodontal operation is under to eliminate massive periodontal inflammation and done adding artificial bone works faster and better bone regeneration .

Complete reconstruction

Complete reconstruction of the upper and lower dental arch due to intense withdrawal right due to aggressive periodontitis . Reconstruction began after periodontal surgery and periodontal inflammation Real ( parodontium ) .

Stabilisation of total prosthesis with implants and locators

Rosary with the edge of the ceramic

Installation FRC peg and prepares the tooth

Installation FRC peg and prepares the tooth , in one visit , for acceptance definitive ceramic crowns.

 

Improving expression restorations

Installation of artificial bone in preparation for implant

Installation of artificial bone in preparation for implant

Surface bleaching

Surface bleaching vital ( healthy ) teeth . Setting the protective membrane . Frosted be one shade . Duration 45 - 60 minutes

Internal bleaching

Bleaching of root -treated teeth that is eventually tarnished . This is about the internal bleaching teeth procedure.

Transforming composite crowns

Reshaping other atypical incisors composite material (white filling)